IEC PAS 62382:2004 ED1

Erstattet

Rettelser og tillegg kjøpes separat.

Språk
Tjenester
Ingen tilgjengelige tjenester

Pris ikke tilgjengelig

Omfang

describes the recommended steps to complete a loop check which comprises the activities between the completion of loop construction (including installation and point-to-point checks) and the start-up of the cold commissioning. This document is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, Panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems except as they relate to the loops being checked (i. e. a motor starter or a power supply to a 4-wire transmitter).

Dokumentinformasjon

  • Standard fra IEC
  • Publisert:
  • Tilbaketrukket:
  • Utgave: 1
  • Versjon: 1
  • Varetype: PAS
  • ICS 25.040.01
  • ISO TC TC 65