Abstract

describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).

Document information

  • Standard from IEC
  • Published:
  • Withdrawn:
  • Edition: 1
  • Version: 1
  • Document type: IS
  • ICS 25.040.01
  • ISO TC TC 65/SC 65E

Product Relations

Product life cycle