IEC 62382:2012 ED2

Revised

Note: This standard has a new edition: IEC 62382:2024 ED3

Corrigendums and amendments are bought separately.

Language
Services

Abstract

IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.

Document information

  • Standard from IEC
  • Published:
  • Withdrawn:
  • Edition: 2
  • Version: 1
  • Document type: IS
  • ICS 25.040.40
  • ISO TC TC 65/SC 65E

Product Relations

Product life cycle